Updates include new sheetrock, doors, windows, light fixtures, kitchen, and bathrooms. Major improvements completed: new roof, new central A/C and heating system, updated electrical, all new PEX plumbing, new 40-gallon water heater, and upgraded insulation (R13 walls, R19 blown). Foundation repaired with added concrete (warranty being verified). Sewer line replaced to the street in 2025. Home features 12–14 ft ceilings, pre-wired for alarm and camera system, and garage with motor and two remotes. Exterior