Premium Content such as Sold Prices, Property History Reports and Saved Searches.
Under construction. Expected completion date May 12. 10 feet ceilings inside the house. 8 feet garage door to fit big trucks. Attic door inside the garage instead of inside the house to improve insulation. 5 tons AC instead of 3. Foam spray insulation in the attic. 5/8 drywall instead of 4/8. AC return in every bedroom instead of 1 for the entire house. Generator inlet already there. Shower has Tile to the ceiling. Spacious backyard porch included. If you appreciate quality, this is the one.
| ---------- | ---------- | ---------- | ---------- |
|---|---|---|---|
| ---------- | ---------- | ---------- | ---------- |
| ---------- | ---------- | ---------- | ---------- |
| ---------- | ---------- | ---------- | ---------- |
| ---------- | ---------- | ---------- | ---------- |
| ---------- | ---------- | ---------- | ---------- |
| ------------- | ------------- |
| ------------- | ------------- |
| -------------------------- | ------------- |
| -------------------------- | ------------- |
| ------------- | ------------- |
| ------------- | ------------- |
| ------------- | ------------- |
| ------------- | ------------- |
| ------------- | ------------- |
| ------------- | ------------- |
Check out assigned and nearby schools along with their detailed ratings and essential information to help you make informed decisions.